SAVY TECH NL Cases Book a free introduction
Back to the start

Cases

What we built

Systems running at Multilas and LBC, and a calculation tool we are building now. For each case you see the system at work, what AI does in it and what people decide.

AI readsRules calculateYou decide

The data in the examples is fictitious. Client quotes will be added once the clients have read them.

AI in practice

Where AI sits in what we built

Five places in a technical company, and what runs at Multilas and LBC. In three places AI reads along. In two, no AI is needed, so we do not use it.

Model · example

Choose a place in the company

  • AI reads
  • Rules calculate
  • You decide

Site

Running at Multilas

Day sheets

Welding dossier

AI reads
the handwriting on the photo of the day sheet: who, which day, which weld, how many hours.
Rules calculate
which line belongs to which weld, through the weld register. Every result becomes a proposal in the queue.
You decide
Someone on your team confirms the proposal. Until then nothing is final, and the original is kept.

Workshop

Running at Multilas

Documents per weld

Welding dossier

AI reads
drawings, 3.1 certificates, NDT reports, welder qualifications and delivery notes. It books nothing: everything goes to review first.
Rules calculate
whether each document belongs to the weld and whether the welder held a valid qualification that day.
You decide
Approving a WPS, accepting a certificate, releasing a weld: that is always done by a person.

Control room

No AI needed · running at LBC

Shift handover

Digital shift handover

AI reads
Nothing. No AI is needed here.
Rules calculate
Every handover gets the same three boxes: running, open, watch out. The history is kept per crew.
You decide
The crew taking over reads and confirms.

Office

No AI needed · running at Multilas

Hours and invoice

Multilas OS

AI reads
Nothing. The hours already arrive per job.
Rules calculate
each subcontractor's rate card (kilometres, travel time, daily allowance) and the invoice line to Onfact.
You decide
what goes on the invoice and when it is sent.

Owner

Built for Multilas

Questions about your figures

Multilas OS

AI reads
your question in plain language, such as: how many hours are on job 226050 this month?
Rules calculate
the answer from your own hours and from Onfact. Asking a question changes nothing.
You decide
what you do with the answer.

At your company that map looks different. Which places need AI and which do not, we work out together.

How we keep AI reliable

This is how it already works in the Multilas welding dossier.

  1. AI proposes, a person confirms

    Every result arrives as a proposal in a queue. Nothing is final until someone on your team confirms it.

  2. When in doubt, a person chooses

    If the system is not sure, you see the options, with the original next to them.

  3. Approval stays human work

    Approving a WPS, accepting a certificate, releasing a weld. The system only proposes.

  4. The original is kept

    Every sheet and every document. You can always look back at what it said.

  5. We measure what it delivers

    How much the system processes correctly by itself, and how much human work is left per dossier.

Bring a day sheet, a delivery note or a certificate. In the conversation we look at what AI can do with your own documents, and what not.

Discuss where AI pays off for you

Process knowledge

What we hear on the shop floor

Tap your sector. It shows what we hear from clients and in conversations, and what the trade terms mean for anyone outside that sector.

Steel construction & weldingWPS · WPQ · 3.1 · NDT

What we come across

  • At every audit, certificates are gathered from e-mails and folders.
  • Whether a welder held a valid qualification that day is checked again every time.
  • The welding dossier is only put together when the client asks for it.

The terms, in plain English

WPS
The welding procedure: how a weld has to be made.
WPQ
The proof that a welder is allowed to make that weld.
3.1 certificate
The supplier's certificate for the steel.
NDT
Inspecting the weld without breaking it.
NCR
A report of what deviates and how it is resolved.
Installation & assemblyday sheet · job reference · extra work

What we come across

  • Hours come in on Friday, on paper or via WhatsApp, and are retyped.
  • Extra work is agreed on site and never reaches the invoice.
  • Subcontractors charge kilometres and travel time differently from what goes to the client.

The terms, in plain English

Day sheet
The sheet on which the crew notes hours and work.
Job reference
The number that hours and costs are booked on.
Extra work
Work that was not in the quote.
HSE (VGM)
The documents for health, safety and environment.
Gaswork order · inspection · certificate

What we come across

  • The work order is filled in on site and retyped at the office.
  • At an inspection, certificates and test reports have to be dug up again.
  • Who holds which authorisation is kept in an Excel file.

The terms, in plain English

Work order
The assignment: what has to be done, where and by whom.
Inspection certificate
The proof that an installation has been inspected.
Work permit
The permission to work on an installation.
Tank storage & shift workshift change · work permit

What we come across

  • The shift handover happens verbally, in a notebook or on a whiteboard.
  • What the previous crew left open only surfaces when something goes wrong.
  • Work permits are followed up on paper.

The terms, in plain English

Shift change
The moment one crew takes over from the other.
Shift handover
What the crew passes on: what is running, what is open, what to watch out for.
Work permit
The permission to work on an installation.
Productionwork order · job costing

What we come across

  • The planning lives in Excel, changes go by phone.
  • The margin per order is only known long after delivery.
  • Quality checks are kept in a notebook nobody looks at any more.

The terms, in plain English

Work order
The assignment for the workshop: what, how many, by when.
Job costing
Working out afterwards what an order really cost.
Lead time
How long an order takes, from order to delivery.

A first conversation

Book a free introduction

30 min · online or at your site · no obligation

Request an introduction

Leave your name and mobile number. We call you back to agree on a moment.

What happens

  1. You tell us how the work runs today, from request to invoice.
  2. We ask questions and say honestly what we would tackle, and what not.
  3. You get a first picture. It costs nothing and does not tie you to anything.

You tell us how the work runs today. We say what we would tackle, and what not. Rather call? +32 474 94 77 78 Or mail sam@savytech.be