Cases
What we built
Systems running at Multilas and LBC, and a calculation tool we are building now. For each case you see the system at work, what AI does in it and what people decide.
The data in the examples is fictitious. Client quotes will be added once the clients have read them.
Five cases, each on its own page
Choose a case. On each page you see the system at work, what AI does in it and what people decide.
-
Welding dossier
For every weld you see who made it, to which procedure, with which material and after which inspection. AI reads the day sheets; a person confirms. See the case -
Multilas OS
From deal and quote to project, hours and invoice in one system. Hours on the phone, the weekly report fills itself. See the case -
Planning board
Who works when, on which site. With leave that a manager approves and a note per day. See the case -
Shift handover
The same three boxes at every shift change, with history. Without AI: it is not needed here. See the case -
Pipe stress
From piping file to report to EN 13480. A person checks the model; the engineer signs. See the case
AI in practice
Where AI sits in what we built
Five places in a technical company, and what runs at Multilas and LBC. In three places AI reads along. In two, no AI is needed, so we do not use it.
Model · example
Choose a place in the company
- AI reads
- Rules calculate
- You decide
Site
Running at Multilas
Day sheets
Welding dossier
- AI reads
- the handwriting on the photo of the day sheet: who, which day, which weld, how many hours.
- Rules calculate
- which line belongs to which weld, through the weld register. Every result becomes a proposal in the queue.
- You decide
- Someone on your team confirms the proposal. Until then nothing is final, and the original is kept.
Workshop
Running at Multilas
Documents per weld
Welding dossier
- AI reads
- drawings, 3.1 certificates, NDT reports, welder qualifications and delivery notes. It books nothing: everything goes to review first.
- Rules calculate
- whether each document belongs to the weld and whether the welder held a valid qualification that day.
- You decide
- Approving a WPS, accepting a certificate, releasing a weld: that is always done by a person.
Control room
No AI needed · running at LBC
Shift handover
Digital shift handover
- AI reads
- Nothing. No AI is needed here.
- Rules calculate
- Every handover gets the same three boxes: running, open, watch out. The history is kept per crew.
- You decide
- The crew taking over reads and confirms.
Office
No AI needed · running at Multilas
Hours and invoice
Multilas OS
- AI reads
- Nothing. The hours already arrive per job.
- Rules calculate
- each subcontractor's rate card (kilometres, travel time, daily allowance) and the invoice line to Onfact.
- You decide
- what goes on the invoice and when it is sent.
Owner
Built for Multilas
Questions about your figures
Multilas OS
- AI reads
- your question in plain language, such as: how many hours are on job 226050 this month?
- Rules calculate
- the answer from your own hours and from Onfact. Asking a question changes nothing.
- You decide
- what you do with the answer.
At your company that map looks different. Which places need AI and which do not, we work out together.
How we keep AI reliable
This is how it already works in the Multilas welding dossier.
AI proposes, a person confirms
Every result arrives as a proposal in a queue. Nothing is final until someone on your team confirms it.
When in doubt, a person chooses
If the system is not sure, you see the options, with the original next to them.
Approval stays human work
Approving a WPS, accepting a certificate, releasing a weld. The system only proposes.
The original is kept
Every sheet and every document. You can always look back at what it said.
We measure what it delivers
How much the system processes correctly by itself, and how much human work is left per dossier.
Bring a day sheet, a delivery note or a certificate. In the conversation we look at what AI can do with your own documents, and what not.
Discuss where AI pays off for youProcess knowledge
What we hear on the shop floor
Tap your sector. It shows what we hear from clients and in conversations, and what the trade terms mean for anyone outside that sector.
Steel construction & welding
What we come across
- At every audit, certificates are gathered from e-mails and folders.
- Whether a welder held a valid qualification that day is checked again every time.
- The welding dossier is only put together when the client asks for it.
The terms, in plain English
- WPS
- The welding procedure: how a weld has to be made.
- WPQ
- The proof that a welder is allowed to make that weld.
- 3.1 certificate
- The supplier's certificate for the steel.
- NDT
- Inspecting the weld without breaking it.
- NCR
- A report of what deviates and how it is resolved.
Installation & assembly
What we come across
- Hours come in on Friday, on paper or via WhatsApp, and are retyped.
- Extra work is agreed on site and never reaches the invoice.
- Subcontractors charge kilometres and travel time differently from what goes to the client.
The terms, in plain English
- Day sheet
- The sheet on which the crew notes hours and work.
- Job reference
- The number that hours and costs are booked on.
- Extra work
- Work that was not in the quote.
- HSE (VGM)
- The documents for health, safety and environment.
Gas
What we come across
- The work order is filled in on site and retyped at the office.
- At an inspection, certificates and test reports have to be dug up again.
- Who holds which authorisation is kept in an Excel file.
The terms, in plain English
- Work order
- The assignment: what has to be done, where and by whom.
- Inspection certificate
- The proof that an installation has been inspected.
- Work permit
- The permission to work on an installation.
Tank storage & shift work
What we come across
- The shift handover happens verbally, in a notebook or on a whiteboard.
- What the previous crew left open only surfaces when something goes wrong.
- Work permits are followed up on paper.
The terms, in plain English
- Shift change
- The moment one crew takes over from the other.
- Shift handover
- What the crew passes on: what is running, what is open, what to watch out for.
- Work permit
- The permission to work on an installation.
Production
What we come across
- The planning lives in Excel, changes go by phone.
- The margin per order is only known long after delivery.
- Quality checks are kept in a notebook nobody looks at any more.
The terms, in plain English
- Work order
- The assignment for the workshop: what, how many, by when.
- Job costing
- Working out afterwards what an order really cost.
- Lead time
- How long an order takes, from order to delivery.
A first conversation
Book a free introduction
30 min · online or at your site · no obligation
Request an introduction
Leave your name and mobile number. We call you back to agree on a moment.
We will call you back to agree on a moment.
What happens
- You tell us how the work runs today, from request to invoice.
- We ask questions and say honestly what we would tackle, and what not.
- You get a first picture. It costs nothing and does not tie you to anything.
You tell us how the work runs today. We say what we would tackle, and what not. Rather call? +32 474 94 77 78 Or mail sam@savytech.be